There are two main kinds of conveying devices in large asphalt plant: belt conveyor and screw conveyor. Belt conveyor is mainly in the mixing station weighing good such as sand and gravel aggregate to the mixing station in the host, and screw conveyor is the cement silo of cement, fly ash and mineral powder and other powder material of cement in the warehouse to the corresponding weighing equipment. The normal operation of the conveying equipment directly affects the productivity of the mixing station, so how to ensure the normal operation of the conveyance is necessary for the necessary daily maintenance. Today, nanyang jintuo engineering machinery co., ltd. introduces the maintenance method of belt conveyor in large concrete mixing station:
1. Clean belt conveyor roller bearing and fill it once every year. After stopping, remove the dirt on the roller and belt and replace the damaged cover.
2. Repair and replace damaged tape and rubber scraper in time;
3. Add lubricating oil or grease to the belt conveyor's speed reducer, electric roller bearing and other parts in time, and replace the engine oil in half a year;
4. Remove the adhesive materials and materials on the roller, roller and roller, and adjust the belt sweeper to ensure the belt cleaning.