After the use of asphalt stirring equipment, the removal, cleaning, maintenance and other work can be carried out in order to be saved for the next use. It is important not only to remove the equipment, but also to prepare for the work. Please pay attention to the details below.
Because asphalt mixing equipment volume is big, and the structure is more complex, therefore before disassembly should according to the location and the actual situation to develop a practical scheme of dismantling, and the related staff. At the same time, we must check the equipment and its parts. Ensure that the power supply, water source and gas source of the equipment are closed.
In addition, the asphalt mixing plant manufacturers in the asphalt mixing equipment should adopt a unified digital id before disassembly positioning method of identification, especially the electrical equipment, should add some mark symbol, can provide the basis for the installation of the equipment. In order to ensure the installation of the operation, proper equipment should be used in the disassembly, and the parts to be removed should be properly kept and not lost or damaged.