Nanyang road construction machinery used for a period of time is needed after cleaning, concrete mixing station should be how to wash, manufacturers, the company as a professional and efficient concrete mixing station with you today to learn together!
The first, regular maintenance procedures for the maintenance of the project, maintenance, such as cleaning, lubrication, refueling, etc
Second, before the concrete mixer starts, check whether the controller is good, then pour water and stones into the mixer for 10~15 minutes to clean, then clean water and stone. When the operator is required to enter the stirring cylinder to clean, remove the power supply and remove the fuse, and lock the switch box.
Third, it is forbidden to remove concrete from the concrete mixer by using sledgehammer.
Fourth, in the freezing season, after the work is completed, water is used to clean the concrete mixer drum and the water pump, water tank and water pipes are cleaned, so as to avoid the freezing of water pumps, water tanks and water pipes.
The above is the company's summary of the part of the mixing station cleaning attention matters, you can be a reference.