南阳市金拓工程机械有限公司

categories of news

Product Categories

Contact Us

Company name: nanyang jintuo road machinery co. LTD

Contact: manager li

Telephone: 0377-60687718

Phone: 13525198266

18697771555

Site. www.jintuozhuji.com

Email: 1216103673@qq.com:

Address: yinhai road, longsheng industrial park, wolong district, nanyang city, henan province


How to save cost of concrete mixing station?

Your current location: Home >> News >> Company news

How to save cost of concrete mixing station?

Release date:2017-10-23 Author: Click:

In the era of rapid development of the construction industry, the concrete mixing station also entered into the crazy expansion mode. Just build a station and make money. Today, the construction industry has entered a period of steady development, with various policies for the management of stirring stations, and the concrete industry can no longer be expanded as before. Mixing stations face serious industry shuffling. How to control the operation cost of the mixing station is a big win in this shuffle and becomes a concern for every webmaster.

One, start from the source, the strict control of raw materials management of concrete quality is directly related to the control of raw materials, strict control of raw materials, have to start from the source, mainly include the following:

1. All bulk raw materials shall be submitted for bidding, comparing with the three companies, providing feedback analysis to the quotation and selecting the competent cooperation units.

2. Establish a sound procurement plan and approval system for raw materials. Have the planning, purchasing and approval process control;

3. Establish a strict inspection and exit inspection system. The material staff strictly control the quantity, quality, standard and plan of the incoming material, and strictly prohibit the entry and acceptance certificate of the inferior quality, non-conformity and unapproved entry.

Second, the process supervision, profit and loss analysis, strict on every link, don't pass every detail to strengthen the raw materials, equipment, process control, strict grasp every link, don't pass every detail, decrease the cost of mixing station.

1. Control the problems caused by raw materials, eliminate waste of raw materials and control the quality of production.

2. Make profit and loss analysis and independent accounting, weekly statistics, monthly summary, always master the differences between raw materials and concrete, and supervise production and operation in 24 hours;

3, equipment, process control, to strengthen the process control and reasonable deployment of vehicles, improve equipment maintenance and maintenance, keep the equipment in good condition, it is strictly prohibited to work, in spite of the waste concrete is not reasonable.

Third, summarization, it is concluded that the cost of the rationalization proposal mixing station control is a long-term and arduous task, to the overall management and whole process management, the full link management and comprehensive management, the combination of economic and management mode. We will continue to strengthen and improve the areas where there is insufficient, and seek a feasible solution, so as to further strengthen the fine management of the mixing station and improve the basic guarantee for the cost of enterprises.

Nanyang road machinery

This article URL:http://jintuozhuji.testxy.com/en/news/347.html

Related tags:南阳筑路机械

Recently Viewed:

code.jpg

s
e
r
v
i
c
e
share 一键分享
Welcome to leave a message
Please enter your message here and we will contact you as soon as possible.
name
Contact
phone
phone
email
email
address
address