Concrete mixing station at the time of use, we should do daily inspection job, as a professional manufacturer of nanyang concrete mixing station and kitco engineering machinery to bring everyone together to learn about how concrete mixing station in daily inspection work.
1. Check the working conditions of the lubricating points of each rotating part of the concrete mixing station and supply the lubricating oil in time.
2. Open a drain valve every day to drain the air compressor and gas storage tanks.
3. Check the oil level of oil mist on the gas road system once a week and use lubricating oil with viscosity of 2.5 ~ 70 E.
4. Check the lubricating oil in the lubricating oil cup and supply the lubricating oil in time.
5. Fasteners (such as bolts and nuts) should be checked regularly and if they are loose, they must be tightened in a timely manner, especially for some parts that are subject to variable load.
6. Regularly clean or replace the filter screen in the powder tank
7. Check the electrical control system and the normal instruments.
Check whether the mixing shaft and cylinder of the concrete mixer are clean and clean. If the concrete is too heavy on the stirring shaft, it must be manually cleaned.
Check whether the equipment of water supply, air supply and admixture system in concrete mixing station is normal.
Ten, if the downtime of more than a week, need to empty the weighing hopper in the material (such as cement, water, additive and aggregate), and clean mixing console, the place such as the hopper, so as to avoid material harden.