南阳市金拓工程机械有限公司

categories of news

Product Categories

Contact Us

Company name: nanyang jintuo road machinery co. LTD

Contact: manager li

Telephone: 0377-60687718

Phone: 13525198266

18697771555

Site. www.jintuozhuji.com

Email: 1216103673@qq.com:

Address: yinhai road, longsheng industrial park, wolong district, nanyang city, henan province


How to do the concrete mixing station batching machine winter maintenance?

Your current location: Home >> News >> Team activities

How to do the concrete mixing station batching machine winter maintenance?

Release date:2017-10-23 Author: Click:

Concrete batching machine is an important part of concrete mixing station. It should pay attention to the maintenance of the batching machine during the winter cold season. Below, the nanyang jintuo engineering machinery co., LTD., together with you, analyze how to strengthen the maintenance of the batching machine of the concrete mixing station?

1. Regularly add the lubricating oil of the batching system and clean up the impurities regularly.

2. Regularly clean the feeding system of the batching machine and the water of the pipe to prevent the winter construction from freezing.

3. After the construction of concrete mixing station is finished, we should clear up the remaining materials in the gravel bin in time so as to prevent the production from freezing on the next day.

4. Before and after the construction of the concrete mixing station, timely clean the sand stone on the roller, so as to avoid the formation of sand and stone, and cut the belt.

The above is the four winter's maintenance and maintenance measures for the batching machine


Nanyang asphalt mixing station

This article URL:http://jintuozhuji.testxy.com/en/news/361.html

Related tags:南阳沥青搅拌站

Recently Viewed:

code.jpg

s
e
r
v
i
c
e
share 一键分享
Welcome to leave a message
Please enter your message here and we will contact you as soon as possible.
name
Contact
phone
phone
email
email
address
address